Skip to main content
All features

Risk & Critical Control

Know your hazards, and know your controls are still working.

Multi-register risk assessment with a configurable 5×5 matrix, plus the critical-control layer that most registers miss: which barriers actually prevent a major accident, what standard each must meet, and whether it was verified this month. The safe systems of work those controls are delivered through live in Control of Work.

ISO 45001 §6.1ISO 31000
app.qoresafe.com
Risk register with probability by severity scoring across registers

Why it matters

Registers that stay alive

Reassessment dates and review cadence are tracked per risk, so a register cannot quietly go stale between audits.

Barriers you can evidence

Each critical control carries a written performance standard, a verification method and a health status — the evidence an auditor asks for.

One number leadership understands

A transparent weighted site risk score combines the contributing factors, each normalised against documented thresholds.

What you get

3 screens in the product — every image below is the real application.

Risk & Critical Control

Risk & HIRA registers

Multi-register risk assessment with a configurable 5×5 probability-by-severity matrix and control hierarchy tracking.

app.qoresafe.com
Risk register with probability by severity scoring across registers

Risk & Critical Control

Critical controls

Critical controls and barriers — their type, criticality, ongoing health and verification cadence, in the bowtie tradition.

app.qoresafe.com
Critical controls with performance standards and verification status

Risk & Critical Control

Site risk score

A transparent, weighted composite score with every contributing factor normalised to 0–100 against documented thresholds.

app.qoresafe.com
Weighted composite site risk score with its contributing factors
Who uses it
Risk managersProject managersSite supervisorsQHSE directors

See Risk & Critical Control on your own processes

Book a 30-minute walkthrough and we will map it to your standards, your sites and your team structure.