Major-accident barriers, and proof they still perform.

For operations where the worst case is a loss of containment rather than a slip: structured hazard studies, tiered process safety events, and the safety-critical elements whose performance standards keep a major accident from happening.

API RP 754OSHA PSMSeveso III
app.qoresafe.com
PHA and HAZOP studies with methodology and revalidation dates

Why it matters

Studies with a revalidation clock

Each HAZOP, What-If, LOPA or FMEA records when it was run and when it is next due, so none silently ages out.

Industry-standard event tiers

Process safety events are classified by API RP 754 tier, giving the leading and lagging indicators of asset integrity.

Barriers with performance standards

Every safety-critical element states the standard it must meet and its current verification health.

What you get

3 screens in the product — every image below is the real application.

Process Safety (PSM)

PHA / HAZOP studies

Structured process-hazard analyses — HAZOP, What-If, LOPA, FMEA — with scope, when they were run, and when revalidation is due.

app.qoresafe.com
PHA and HAZOP studies with methodology and revalidation dates

Process Safety (PSM)

Process safety events

Loss-of-containment and related events classified by API RP 754 tier.

API RP 754

app.qoresafe.com
Process safety events classified by API 754 tier

Process Safety (PSM)

Safety-critical elements

The barriers that prevent or mitigate a major accident, with the performance standard each must meet and its current health.

app.qoresafe.com
Safety-critical elements with performance standards and verification health
Who uses it
Process safety engineersAsset integrityOperations managersTechnical authorities

See Process Safety (PSM) on your own processes